The City of Yuma has over 28 miles of roadway and streets. The Street Crew is responsible for maintaining all of the alleys, roads and streets.
Maintenance on the alleys, roadways and streets includes everything from patching pot holes, crack sealing and paving in the Summer months to snow plowing and snow hauling during the Winter season.
2011 Certification of Streets: H.U.T. Report
January 12, 2012
Arterial Streets = Gravel = 6.67 miles
Local Streets = Asphalt Paved = 21.76 miles
Total = 28.43 miles